INSP-Final Inspection | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 6/5/2013 | 6/6/2013 | 6/6/2013 | A | FAIL |
Troy Cobbley
|
|
|
Forward flush verification is needed and the PIV tamper switch needs to be adjusted.
|
INSP-Final Inspection | 4/24/2013 | 4/25/2013 | 4/25/2013 | P | FAIL |
Troy Cobbley
|
|
|
Still need to test the interconnection with the fire alarm control system, provide pressure relief vavle and submit on the work that was performed outside of the approved scope of work as requested last inspection.
|
INSP-Sprinkler Rough-in | 4/9/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Troy Cobbley
|
|
|
Upper level ceiling tile is ok to cover pipe. Work is being done outside of the scope of work shown on the drawings and will need to be submitted for review. It is protection in a small storage area.
|
INSP-Sprinkler Rough-in/Hydro | 3/27/2013 | 3/28/2013 | 3/28/2013 | P | PASS |
Troy Cobbley
|
|
|
This is for an overhead hydro. Please call Perly at ###-####. Overhead hydro passed visual guage inspection.
|
INSP-Sprinkler Rough-in | 3/14/2013 | 3/14/2013 | 3/14/2013 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was for the 1" supply line that is located in the vertical chase. It supplies water to the sidewall head in the Sally Port. Piping is ok to cover.
|
INSP-Sprinkler Rough-in | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PASS |
Troy Cobbley
|
|
|
Upper level sprinkler piping above the hardlids is ok to cover. Piping above the lay in ceiling tile nt inspected yet due to t-bar not being installed yet.
|
INSP-Supply line flush | 2/28/2013 | 3/4/2013 | 3/4/2013 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line and the remote FDC supply line fludh passed
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro passed
|
INSP-Sprinkler Rough-in/Hydro | 2/21/2013 | 2/21/2013 | 2/21/2013 | P | CANC |
Forrest France
|
|
|
Overbooked
|