INSP-Final Inspection | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR-Aging Inspection | 5/30/2018 | 5/30/2018 | 5/31/2018 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Sprinkler Rough-in | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed
Please call Jeff with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Conference | 6/2/2017 | 6/6/2017 | 6/7/2017 | A | DONE |
Troy Cobbley
|
|
|
On Site discussion to verify requirements for moving forward on final inspections. Please call to arrange time frame of conference when available. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR-Aging Inspection | 6/1/2017 | 6/1/2017 | 6/1/2017 | | DONE |
Troy Cobbley
|
|
|
I spoke to Jeff and let him know this needs to be finished up and I will need to hold up any additional occupancy permits until it has been addressed.
|
FIR-Aging Inspection | 1/19/2016 | 1/19/2016 | 1/19/2016 | | NR |
Troy Cobbley
|
|
|
Jeff is going to follow up with Tim about possible plan modifications due to the scope of work changing.
|
FIR-Aging Inspection | 9/8/2015 | 9/8/2015 | 9/9/2015 | | NR |
Troy Cobbley
|
|
|
Jeff is going to follow up.
|
FIR-Aging Inspection | 1/24/2014 | 1/24/2014 | 1/28/2014 | | NR |
Troy Cobbley
|
|
|
Jeff is going to follow up on status
|
FIR-Aging Inspection | 4/9/2013 | 4/9/2013 | 4/10/2013 | | NR |
Troy Cobbley
|
|
|
Jeff is going to follow up on job status per phone conversation.
|