INSP-Final Inspection | 10/8/2012 | 10/9/2012 | 10/9/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Tim Frost is ok with no hydro test
|
INSP-Supply line flush | 10/8/2012 | 10/8/2012 | 10/8/2012 | P | PASS |
Troy Cobbley
|
|
|
The center section as shown on the approved plans is ok to cover. Also the underground supply line flush passed.
|
INSP-Sprinkler Rough-in | 10/4/2012 | 10/8/2012 | 10/8/2012 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for two of the three shown locations where the underground supply line can be covered. Per contractor mechanical restraints are being used at the fittings. As-builts are required showing the 6" pipe instead of the 8".
|