INSP-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 1/16/2013 | 1/16/2013 | 1/16/2013 | P | FAIL |
Troy Cobbley
|
|
|
Retested and sent signals but none were received at central station. All so still need map and as-builts.
|
INSP-Final Inspection | 1/15/2013 | 1/15/2013 | 1/16/2013 | P | CANC |
Troy Cobbley
|
|
|
To be canceled per Rand Phone #: ###-####
|
INSP-Final Inspection | 1/14/2013 | 1/14/2013 | 1/14/2013 | P | FAIL |
Troy Cobbley
|
|
|
For todays inspection we verified strobe spacing in the high ceiling areas. At the east end of the building Rand and I agreed that relocating one strobe in the low ceiling area will provide coverage in another high ceiling area. That work was performed as I waited. The smoke detectors were tested as well. However no signals were received at the monitoring station. To final this project signals need to be received, as-builts provided, map at the facp.
|
INSP-Final Inspection | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was just verification that the notification circuits and devices functioned.They were out of sync but were repaired. EOL voltage was verified as ok. Candellas were adjusted in several locations due to spacing issues. Spacing was verified on only the low ceiling areas. The high ceilings will need to be checked later. As-builts will be required showing the revised circuits and candellas and additional devices.
|
INSP-Sprinkler Rough-in | 12/24/2012 | 12/24/2012 | 12/24/2012 | P | DONE |
Troy Cobbley
|
|
|
rand and I went over smoke alarms in the daycare area and strobe coverage.
|
INSP-Final Inspection | 12/20/2012 | 12/21/2012 | 12/21/2012 | P | CANC |
Forrest France
|
|
|
Rand Phone #: ###-####
|
INSP-Final Inspection | 12/20/2012 | 12/20/2012 | 12/20/2012 | P | CANC |
Troy Cobbley
|
|
|
Notice of NSF check received 12-20-12 for this permit///final inspection cancelled until payment is received - Rand Phone #: ###-####
|