INSP-Final Inspection | 1/18/2013 | 1/22/2013 | 1/22/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro and rough-in passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test for the new storage area piping failed due to visable drop on the pressure guage. Also the earthquake attachments do not match the city approved drawings and don't have through bolts for the wood members per NFPA 13 Chapter 9.
|
INSP-Sprinkler Rough-in/Hydro | 1/16/2013 | 1/16/2013 | 1/16/2013 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints. jeremy Phone #: ###-####
|