INSP-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/12/2013 | 8/14/2013 | 8/14/2013 | A | FAIL |
Troy Cobbley
|
|
|
Permit will be able to final when the ceiling and pendant is installed in the electrical/mechanical room.
|
INSP-Sprinkler Rough-in/Hydro | 8/7/2013 | 8/9/2013 | 8/9/2013 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test for the first and second floor wet systems passed.
|
INSP-Sprinkler Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough to cover on first and second floors. See the city approved plans for areas marked "ok" in red. I noted one electrical room missing an upright sprinkler head.
|
INSP-Sprinkler Rough-in | 8/5/2013 | 8/6/2013 | 8/6/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional areas on the second floor where sprinkler piping can be covered. First floor needs the ceiling tile removed so that a rough-in inspection can be performed.
|
INSP-Sprinkler Rough-in | 7/12/2013 | 7/15/2013 | 7/15/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough to cover passed for areas marked ok on the second floor.
|
INSP-Sprinkler Rough-in | 7/11/2013 | 7/11/2013 | 7/12/2013 | P | PASS |
Troy Cobbley
|
|
|
Cover inspection for remainder of hard lid ceilings on the second floor passed except for the restrooms in the northwest corner
|
INSP-Sprinkler Rough-in | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans locatons marked "ok" where sprinkler piping can be covered at hard lid area.
|
INSP-Sprinkler Rough-in | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location on the west end of the second floor where piping is ok to cover.
|
INSP-Sprinkler Rough-in | 6/19/2013 | 6/20/2013 | 6/20/2013 | P | PART |
Forrest France
|
|
|
Marked and dated locations on plans at the 1st and 2nd floor sheetrock lid areas including the mens and womens restrooms, kitchen and storage room okay for cover. Previous correction items at the basement including the painted upright and one missing head completed.
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2013 | 5/22/2013 | 5/22/2013 | P | PASS |
Troy Cobbley
|
|
|
The 200lb hydro on the basement system passed. Sprinkler rough-in for the basement passed inspection and the remaining ceiling tile areas can be installed. I noted one location that an upright sprinkler needs to be installed as per plans, one painted head that needs replaced and one bent all thread rod that needs replaced. Also the remaining hardlids, except for the unfinished restrooms, on the first floor can be installed to cover the sprinkler piping.
|
INSP-Sprinkler Rough-in | 5/14/2013 | 5/15/2013 | 5/15/2013 | A | PASS |
Troy Cobbley
|
|
|
Rough to cover in basement and first floor for piping above the hardlids passed. See the city approved plans for exact locations.
|
INSP-Sprinkler Rough-in | 5/7/2013 | 5/7/2013 | 5/7/2013 | A | PASS |
Troy Cobbley
|
|
|
Rough-in of the remainder of hard lid ceilings in basement is passed. Piping can be covered. See the city approved plans for locations marked "ok" in red.
|
INSP-Sprinkler Rough-in | 5/3/2013 | 5/6/2013 | 5/6/2013 | A | PASS |
Troy Cobbley
|
|
|
Rough-in inspection on the hard lids in the basement restrooms passed. Piping can be covered (already had been)
|
INSP-Sprinkler Rough-in | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | DONE |
Troy Cobbley
|
|
|
Inspection was actually for a conference to discuss the duct work causing obstructions to the sprinkler system. I refered to section 8.6.5.2.1.3 of NFPA 13.
|