DOC - Permit Finaled | | | 10/14/2013 | | DONE |
Christina Prado
|
|
|
Per Craig Hanson
|
INSP-Sprinkler Rough-in | 10/1/2013 | 10/2/2013 | 10/3/2013 | P | PART |
Forrest France
|
|
|
Overhead hydro - Nate Phone #: ###-####
|
INSP-Supply line flush | 9/27/2013 | 9/30/2013 | 9/30/2013 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | CANC |
Troy Cobbley
|
|
|
Canceled per general contractor until the water problem is solved.
|
INSP-Sprinkler Rough-in/Hydro | 8/26/2013 | 8/27/2013 | 8/27/2013 | P | DONE |
Troy Cobbley
|
|
|
Underground hydro passed
|
INSP-Sprinkler Rough-in/Hydro | 8/23/2013 | 8/26/2013 | 8/26/2013 | P | CANC |
Troy Cobbley
|
|
|
Per Nate cant get water on site. Will reschedule for tomorrow.
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2013 | 8/26/2013 | 8/23/2013 | A | CANC |
Forrest France
|
|
|
This is an ug hydro. Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | PASS |
Troy Cobbley
|
|
|
Underground piping is approved to cover as marked on the city approved plans.
|