INSP-Final Inspection | 8/15/2013 | 8/16/2013 | 8/16/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection and walkthrough.
|
INSP-Final Inspection | 8/15/2013 | 8/15/2013 | 8/15/2013 | A | PART |
Forrest France
|
|
|
Rough-in completed, inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2013 | 8/9/2013 | 8/9/2013 | P | PART |
Forrest France
|
|
|
OH hydrostatic testing for the new system additions completed satisfactory. Also completed rough-in inspection.
|
INSP-Conference | 8/5/2013 | 8/6/2013 | 8/6/2013 | P | DONE |
Forrest France
|
|
|
On site conference regarding review note item #7, and conditions per NFPA 13 24.2.1.6.
|
INSP-Sprinkler Rough-in/Hydro | 8/5/2013 | 8/6/2013 | 8/6/2013 | P | CANC |
Forrest France
|
|
|
cesar Phone #: ###-####
|