INSP-Final Inspection | 10/30/2014 | 10/31/2014 | 10/30/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | CANC |
Forrest France
|
|
|
Please call when you are on your way Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Final Inspection | 10/21/2014 | 10/21/2014 | 10/21/2014 | P | NR |
Forrest France
|
|
|
Pending project related fire alarm work.
|
INSP-Final Inspection | 10/20/2014 | 10/21/2014 | 10/21/2014 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Supply line flush | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | PASS |
Troy Cobbley
|
|
|
Forward flow test passed
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2014 | 10/7/2014 | 10/7/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed on the second try.
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2014 | 10/3/2014 | 10/3/2014 | P | CANC |
Troy Cobbley
|
|
|
Was to be an underground hydro. Canceled due to pressure loss.
|
INSP-Supply line flush | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Troy Cobbley
|
|
|
Verified combustible concealed spaces are filled with insulation. Will need verification that the insulation is non-combustible. Also verified three added dry uprights to provide additiional protection where heads were previously overspaced.
|
INSP-Sprinkler Rough-in | 9/29/2014 | 9/30/2014 | 9/30/2014 | P | CANC |
Troy Cobbley
|
|
|
Finished rough-in inspection at the morning inspection request.
|
INSP-Sprinkler Rough-in | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Troy Cobbley
|
|
|
Remaining rough-in passed. Riser room/piping not built/installed yet.
|
INSP-Sprinkler Rough-in | 9/26/2014 | 9/29/2014 | 9/29/2014 | P | CANC |
Troy Cobbley
|
|
|
Performed a rough-in inspection this morning. No time for second visit today.
|
INSP-Sprinkler Rough-in | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations where the rough-in inspection has passed. i noted three dry uprights that appear to be overspaced.
|
INSP-Supply line flush | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | PASS |
Troy Cobbley
|
|
|
Inspection was not for a flush but for the underground supply hydro test. The hydro test passed.
|
INSP-Supply line flush | 7/14/2014 | 7/14/2014 | 7/14/2014 | A | FAIL |
Troy Cobbley
|
|
|
Inspection requested via web by Anthony Minichiello
No contact phone number so I went to the project site and was unable to contact the sprinkler contractor and there is no pressure on the underground supply piping.
|
INSP-Supply line flush | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Anthony Minichiello
|
INSP-Supply line flush | 7/10/2014 | 7/10/2014 | 7/10/2014 | P | PASS |
Troy Cobbley
|
|
|
Inspection was not for a flush but for a cover inspection of the underground supply. The cover inspection passed and the pipe can be buried.
|
INSP-Supply line flush | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PART |
Troy Cobbley
|
|
|
Verified depth of bury and size is correct. No thrust blocks installed yet.
|
INSP-Supply line flush | 6/26/2014 | 6/30/2014 | 6/30/2014 | P | FAIL |
Troy Cobbley
|
|
|
Underground supply piping was not ready for inspection. Anthony and I discussed sprinkler protection in the concealed spaced.
|
INSP-Sprinkler Rough-in | 6/26/2014 | 6/27/2014 | 6/27/2014 | P | DONE |
Troy Cobbley
|
|
|
Inspection was part rough-in and part conference. The dry sprig ups, per conversation with Anthony, are too far from the deck but it appears that Anthony has a solution. I started the rough-in inspection for the piping under the mezzanine but stopped after finding pipe re-routing, elevation changes and alot of additional fittings. Also the "interstitial" space above the first floor ceiling and the second floor is a combustible concealed space with no sprinkler protection. After finding these items I determined that a plan modification will be needed so I stopped inspecting this area. I continued with the upper level piping and found for the most part the rough-in is passed but 25% of the piping has not been instlled yet as well as all of the branchline seimic bracing and earthquake bracing has not been installed yet. There has also been minor pipe routing changes and additional fittings here as well. I also found atleast one flat face bushing being used to reduce a 1 1/2" pipe to 1 1/4".
Per Anthony and I's conversation today, I will be requested to come back out after the plan modifications are approved for a re-inspection.
|
INSP-Sprinkler Rough-in | 6/26/2014 | 6/27/2014 | 6/26/2014 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|