INSP-Final Inspection | 2/23/2016 | 2/24/2016 | 2/24/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/31/2016 | 2/1/2016 | 2/1/2016 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved drawings for list of correctins needed for a final
|
INSP-Final Inspection | 1/28/2016 | 1/29/2016 | 1/28/2016 | P | CANC |
Troy Cobbley
|
|
|
Test while out on FIR15-00618. Available after 10:00 for the rest of day. Phone #: ###-#### >> Inspection requested via web by Brian Richard Inspection cancelled from web by: Brian Richard
|
INSP-Final Inspection | 1/26/2016 | 1/27/2016 | 1/27/2016 | P | CANC |
Troy Cobbley
|
|
|
Inspector unable to perform inspection do to time constraints. Left message with applicant @ ###-####. Will perform inspection following day.
|
INSP-Final Inspection | 1/25/2016 | 1/26/2016 | 1/26/2016 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Richard Inspection cancelled from web by: Brian Richard
|
INSP-Alarm Testing | 12/23/2015 | 12/24/2015 | 12/24/2015 | A | DONE |
Jim Page
|
|
|
Notated devices tested on city approved drawings.
|
INSP-Alarm Testing | 12/14/2015 | 12/21/2015 | 12/21/2015 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Richard
|
INSP-Alarm Testing | 12/14/2015 | 12/18/2015 | 12/14/2015 | A | CANC |
Troy Cobbley
|
|
|
Early as possible Phone #: ###-#### >> Inspection requested via web by Brian Richard Inspection cancelled from web by: Brian Richard
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2015 | 12/18/2015 | 12/14/2015 | A | CANC |
Troy Cobbley
|
|
|
Early as possible Phone #: ###-#### >> Inspection requested via web by Brian Richard Inspection cancelled from web by: Brian Richard
|
INSP-Conference | 11/6/2015 | 11/9/2015 | 11/9/2015 | A | DONE |
Troy Cobbley
|
|
|
Jason Phone #: ###-####
|
INSP-Conference | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | CANC |
Troy Cobbley
|
|
|
Jason Phone #: ###-####
|