INSP-Final Inspection | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2016 | 8/17/2016 | 8/17/2016 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test complete for dry system. Rough to cover inspection for dry system protecting the east side canopy complete, Overhead fire sprinkler piping located above hardlid in east side canopy approved for cover.
|