Permit Information
Permit NumberFIR16-00793
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 8617 W POCONO ST
Project NameSilvercloud Building #1-1
Customer Number 
ePlanReviewYes
Description
[Silvercloud Building #1-1]
The fire sprinkler scope of work consists of protecting a two level apartment building with a NFPA 13R system. New 2” underground supplies two 2” wet pipe systems. All piping is CPVC piping. The top level piping is to be tented.

[BLD16-02408] – The NFPA 13R fire sprinkler system is used for occupancy. To construct a 2 story apartment building having 6 side-by-side 2 story dwelling units. The dwelling units do not comply as townhomes as defined by the Boise City Code because there are no property lines between them and because the utilities are not separate. This building has a total floor area of about 12,420 square feet (6,871 square feet 1st story and 5,549 square feet 2nd story). Each dwelling unit has 2 stories. None of the dwelling units are required to comply as Type B dwelling units. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior walls, exterior siding, shear walls, wood joist 2nd story floors, doors, windows, interior stairways, gas fireplaces, wood truss roof, roof coverings, millwork, and finishes. Engineered wood trusses are a deferred submittal item. Special Inspection is required for soils, shear walls, diaphragms, concrete, and post-installed anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/30/20182/2/20182/2/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Sprinkler Rough-in10/9/201710/10/201710/10/2017APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
INSP-Sprinkler Rough-in/Hydro9/11/20179/12/20179/12/2017PPASS
DetailsTroy Cobbley
Overhead hydro test passed.

Jonathan Phone #: ###-####
INSP-Supply line flush9/11/20179/11/20179/11/2017PDONE
DetailsJim Page
Underground main line flush complete
INSP-Sprinkler Rough-in4/7/20174/7/20174/7/2017PPASS
DetailsTroy Cobbley
Underground supply piping is ok for cover