INSP-Final Inspection | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply has been witnessed and completed.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Supply line flush | 11/20/2017 | 11/21/2017 | 11/21/2017 | P | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Supply line flush | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | CANC |
Jim Page
|
|
|
Inspection request is for 21NOV2017, this request is cancelled.
|
INSP-Sprinkler Rough-in | 1/12/2017 | 1/13/2017 | 1/13/2017 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for underground supply complete, remaining underground which includes PIV will be installed at a later date. Piping installed consist of stub up and ductile iron for under footing, installed underground piping is approved for cover.
|
INSP-Sprinkler Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | CANC |
Jim Page
|
|
|
Inspection request per conversation with point of contact, Chris Phone #: ###-####, inspection request will be rescheduled for a later date.
|