INSP-Final Inspection | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Colton Phone #: ###-####
|
INSP-Final Inspection | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | PART |
Troy Cobbley
|
|
|
Not ready for a final yet. I need as-builts showing the additional notification devices that have been added for walls that have not been installed yet. If the walls do not get installed then the as-builts need to reflect that. Also the security locks have not been installed on the south side doors for testing/release upon activation of fire alarm. I spoke to Colton with Simplex about this.
|
INSP-Alarm Testing | 7/27/2017 | 7/27/2017 | 7/27/2017 | P | DONE |
Troy Cobbley
|
|
|
Phase 1 (northwest quadrant) fire alarm complete.
Colton Phone #: ###-####
|
INSP-Alarm Testing | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for phase 1 (north west quadrant). Notification did function but the doors did not release upon activation of the fire alarm system. Building plans are going to be resubmitted to see if the door mags will be allowed.
|