INSP-Final Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | FAIL |
Troy Cobbley
|
|
|
As-builts did not match install
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | FAIL |
Troy Cobbley
|
|
|
Permit will be ok to final when as-builts have been provided to plan review.
|
INSP-Supply line flush | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered except for tie in area
|