Permit Information
Permit NumberFIR18-00373
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1845 S FEDERAL WAY
Project NamePeace Valley Charter School
Customer Number 
ePlanReviewYes
Description
[Peace Valley Charter School]
The fire sprinkler scope of work consists of new 6” x 85’± C-900 underground piping to 4” main to a 3” riser with backflow preventer. The system is design as a 2 ½”x2”x1 ½” grid. Extended coverage sprinklers are being utilized. The wet system is protecting a charter school.

[BLD18-01222]
There are no TI plans at this time.

Permit for interior nonstructural demolition pending submittal of tenant improvement plans. No exterior modifications are allowed under this permit. All electrical is required to be terminated at a junction box or the panel. This building is not fire sprinklered. CDM


Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/30/20188/31/20188/31/2018APASS
DetailsTroy Cobbley
Permit finaled

Roy Phone #: ###-####
INSP-Sprinkler Rough-in8/29/20188/30/20188/30/2018APASS
DetailsTroy Cobbley
Yesterdays corrections have been addressed. See email dated 8/29/18 addressing issues. Per contractor statement the exterior attached canopy is not a concern, again see email. All overhead piping is ok for cover.

Roy Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro8/28/20188/29/20188/29/2018APART
DetailsTroy Cobbley
Overhead hydro witnessed and passed. Rough-in passed except branchline restraints are needed on almost all of the outriggers and also need to be place correctly on the grid branchlines, need the correct earth quake attachments used or resubmit the ones installed, provide clearance as discussed where the branchlines pass under structural members, provide verification the main entry canopy, which is not shown on the plans, does not require sprinkler protection above or below. Piping is ok to cover, as discussed, except in the areas where I need to re-verify work.

Phone #: ###-#### Inspection requested via web by Chris Green
INSP-Final Inspection8/27/20188/28/20188/28/2018PFAIL
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping has not been completed, overhead hydrostatic test has not been completed. Rough to cover inspection and hydrostatic test must be completed before final inspection can be performed.


Jeff Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro8/2/20188/3/20188/3/2018ADONE
DetailsJim Page
Hydrostatic test for undergorund supply witnessed, no pressure loss observed at riser provided gauge.

UG hydro // Gabe Phone #: ###-####
INSP-Supply line flush8/2/20188/2/20188/2/2018PDONE
DetailsJim Page
Undergorund main line flush complete.

Gabe Phone #: ###-####
INSP-Sprinkler Rough-in8/1/20188/1/20188/1/2018APASS
DetailsJim Page
Rough to cover inspection for undergorund supply complete, approved for cover.
INSP-Supply line flush7/31/20188/1/20188/1/2018ACANC
DetailsJim Page
Inspection request today was for a rough to cover inspection for underground supply, this request is cancelled and the correct request will be generated.

Gabe Phone #: ###-####