INSP-Final Inspection | 12/16/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. The hydro test and underground flush were completed under FIR18-00629.
New underground final. Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Final Inspection | 9/16/2019 | 9/17/2019 | 9/16/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
INSP-Sprinkler Rough-in | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok for cover. Stan is going to send pictures of the conduit for the tamper switch prior to cover.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Conference | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit called in
Zac Phone #: ###-####
|