Description |
[Jacobs - 10th & 12th Floor]
The fire sprinkler scope of work consists of adding or relocating sprinklers throughout the TI spaces per NFPA 13 2016 for light hazard. In open to structure areas new steel piping will be installed or existing steel piping will be utilized for the new layout.
[BLD18-01760]
Permit is to remodel the 10th and 12th floor within the existing building (approximately 9,304 sq. ft. on the 1th floor and 17,572 sq. ft. on the 12th floor, tenant to occupy part of the 10th floor and all of the 12th floor) Note: the demo work was done under BLD18-01055. Approval is contingent upon adhering to the approved plans on file. Work to include: on the construction of interior non-bearing walls creating tenant demising walls, offices, break rooms, storage room, equipment room, phone rooms, conference rooms, closets, wellness room, privacy rooms, lan room, work rooms, reception areas, server room and open office areas, new door/door frames, millwork, interior windows, suspended acoustic and gypsum ceilings/soffits, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.
• There are no AMM at this time.
|