INSP-Final Inspection | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
This is scheduled for 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered
Phone #: ###-#### Inspection requested via web by Sam Ball
|