INSP-Final Inspection | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Inspection has be around 7or 7:30am Phone #: ###-#### Inspection requested via web by Rafe Barrett
|
INSP-Final Inspection | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need the strobe in the restroom removed and as-builts provided.
Inspection needs to be done around 7:30am Phone #: ###-#### Inspection requested via web by Rafe Barrett
|
INSP-Alarm Testing | 2/18/2019 | 2/19/2019 | 2/19/2019 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tomorrow morning. Phone #: ###-#### Inspection requested via web by Rafe Barrett
|