INSP-Final Inspection | 2/21/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection for area of work complete.
Needs to be done at 7am. Phone #: ###-#### Inspection requested via web by James Williams
|
INSP-Final Inspection | 7/29/2019 | 7/31/2019 | 7/31/2019 | A | CANC |
Jim Page
|
|
|
Need to do at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 2/20/2019 | 2/22/2019 | 2/22/2019 | A | PART |
Jim Page
|
|
|
Speaker strobe in elevator lobby is operational, sound on floor still needs to be improved. Per conversation with Ron Johnson a 30 day TCO is authorized pending the audio issue is resolved.
Need to schedule for 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | FAIL |
Jim Page
|
|
|
Speaker strobe in elevator lobby outside the scope of work did not operate. Sound on floor from speaker strobes did not meet the sound requirements, need to make neccessary changes to increase sound volume, could barely hear audible alarm when office doors were closed.
This is scheduled for 7:00 am Phone #: ###-#### Inspection requested via web by Sam Ball
|