INSP-Final Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | FAIL |
Troy Cobbley
|
|
|
Tenant would not let us set off alarms so I did a walk through and checked device locations. I noted acouple changes that will be needed and that as-builts will be required to reflect these changes.
Contact is Dirk. Dirk will be available after 9am. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PART |
Troy Cobbley
|
|
|
Phase 1 work is complete
Contact is Dirk.
Phase A partial final. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|