INSP-Final Inspection | 3/20/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Payton Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Atton Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
No access, doors are locked. No inspection performed.
Payton Phone #: ###-####
|