INSP-Final Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | FAIL |
Troy Cobbley
|
|
|
Permit will need to be scheduled for a final when test papers have been emailed in as discussed.
Contact : George Jess - Final for Underground, Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. FDC modification is still needed. George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed. George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | P | PART |
Troy Cobbley
|
|
|
**Partial Rough Inspection Pass** Inspection of pipe hangers prior to the installation of roof insulation**MAS**
Kenny Caldwell is the contact. This is to be a rough-in hanger inspection. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus
|