INSP-Final Inspection | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete.
Troy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Adam Phone #: ###-####
|