INSP-Sprinkler Rough-in | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PASS |
Troy Cobbley
|
|
|
Piping in first floor soffits is ok for cover.
Screened- Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
Troy Cobbley
|
|
|
Piping in the second floor soffits is ok for cover.
screened // MIke Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Troy Cobbley
|
|
|
Piping in the third floor soffits is ok for cover.
Screened- Tanner Phone #: ###-####
|
INSP-Supply line flush | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | CANC |
Troy Cobbley
|
|
|
Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Troy Cobbley
|
|
|
Heat taped piping is ok for cover. Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | CANC |
Troy Cobbley
|
|
|
Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/6/2020 | 5/6/2020 | 5/7/2020 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed, heat tape/insulation complete. All piping can be covered. Screened- Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | FAIL |
Troy Cobbley
|
|
|
Need as-builts showing the pipe routing changes and pipe size changes, repair the tenting in two spots, relocate one overspaced pendant in the breezeway and repir two hangers on the first floor.
screened // Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | CANC |
Troy Cobbley
|
|
|
Cancel per point of contact. Tanner **Cleared** Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number scheduled. Bill Phone #: ###-####
|