INSP-Final Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Jim Page
|
|
|
As-builts have been accepted, final fire alarm inspection for scope of work complete.
|
INSP-Final Inspection | 1/28/2020 | 1/31/2020 | 1/31/2020 | A | PART |
Jim Page
|
|
|
Fire alarm inspection is compliant with NFPA72, as-builts need to be submitted, approved and fees paid before permit can be finaled.
Please start Final at 9:30 as this system is connected to the Hampton Inn hotel and it can''t go off past 10:00 AM. Eric will be on site. Phone #: ###-#### Inspection requested via web by Fire Scheduler
|
INSP-Final Inspection | 1/22/2020 | 1/24/2020 | 1/24/2020 | A | CANC |
Greg Ruxton
|
|
|
I could not meet the contractor at the time he needed to meet. No inspection performed. Please conduct the Final at 10:00 AM as this is going to be the Fire Alarm in the Hampton in downtown. Eric will be the tech on site. Thank you Phone #: ###-#### Inspection requested via web by Fire Scheduler
|