Final | 12/16/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Becky Granden- final ok
|
Pressure Test | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Brian Scoles
|
|
|
gas test- 60lb gas pass whole system
|
Mec-Aging Inspection | 9/17/2018 | 9/17/2018 | 9/17/2018 | | CANC |
Brian Scoles
|
|
|
WIP
|
Rough-in | 6/17/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Becky Granden- R/I ok
|
Pressure Test | 6/18/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Becky Granden- 20lb gas pass
|
Rough-in | 6/10/2018 | 6/11/2018 | 6/11/2018 | A | PART |
Brian Scoles
|
|
|
Inspection requested via web by Becky Granden- range hood and dryer exhaust will install by final
|
Pressure Test | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | PART |
Brian Scoles
|
|
|
Inspection requested via web by Becky Granden- 5lb flue pass- 20lb gas test fail gauge wont zero out- need to add a/c, bath fan and gas pressure test to permit
|
Mec-Request for Extension | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Brian Scoles
|
|
|
Becky Phone #: ###-####- ok
|
Mec-Aging Inspection | 4/25/2018 | 4/25/2018 | 4/25/2018 | | PEND |
Brian Scoles
|
|
|
WIP- per phone call will schedule inspection when ready in next 4 months
|
Conference | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | PASS |
Chad Schwendiman
|
|
|
Hi Ben,
We''re ready for the pressure test so we can start backfilling. - 20lb gas pass for underground gas piping
Thanks, Luke Phone #: ###-#### Inspection requested via web by Becky Granden
|
Rough-in | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PEND |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Becky Granden conf. for gaspiping
|