Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow - final on three fireplaces ok
|
DOC - Permit Expired | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Chad Schwendiman
|
|
|
No scheduled activity in the last 180 days Permit is expired
|
Mec-Aging Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | | DONE |
Jack Reynolds
|
|
|
Called Wholesale fireplaces and talked with Bill about this mechanical aging permit.
|
Rough-in | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Jack Reynolds
|
|
|
Shawn Simonson Phone #: ###-#### Inspection requested via web by Sheldon Lebow - 2nd floor fireplace R/I ok- call final in when fireplaces are finished
|
Rough-in | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | NR |
Chad Schwendiman
|
|
|
Call Sheldon Lebow at ###-#### ahead of time so that he can meet inspector at job site. Phone #: ###-#### Inspection requested via web by Sheldon Lebow - Need to reinstall framing then reschedule rough-in inspection.
|
Rough-in | 6/1/2018 | 6/4/2018 | 6/4/2018 | A | FAIL |
Jack Reynolds
|
|
|
Shawn Simonson Phone #: ###-#### Inspection requested via web by Sheldon Lebow - fireplace upstairs failed due to framing clearances and the flue going out the back of the fireplace. if the flue comes out the top of fireplace clearances will be good.also need clearances on side of fireplace- gasline needs to be rigid or sleeved going through the fireplace. gas line also needs a shut off valve ahead of fireplace-
|