Final | 11/16/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Jack Reynolds
|
|
|
0824 Phone #: ###-#### Inspection requested via web by Gary Reeves - final ok
|
Rough-in | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok
|
Rough-in | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- return runs upstairs in the attic does not match sizes on man J- dryer vent upstairs needs another nail plate
|
Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | NR |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- crawl not finished- return runs upstairs in the attic does not match sizes on man J- dryer vent upstairs needs another nail plate
|
Pressure Test | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 5lb flue test ok - 20lb gas pressure test ok
|