Final | 8/6/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Brian Scoles
|
|
|
Final ok-
|
Mec-Aging Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | | FAIL |
Brian Scoles
|
|
|
contractor needs to schedule final inspection- bld was finaled out without this permit being finaled
|
Mec-Aging Inspection | 5/7/2019 | 5/7/2019 | 5/7/2019 | | DONE |
Chad Schwendiman
|
|
|
Building permit was finaled without mechanical being signed off. House appears to be occupied at this time. I called contractor and asked them to get with homeowner to schedule final inspection
|
Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok
|
Pressure Test | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 20lb gas pass
|
Rough-in | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- gas gauge wont zero out- dryer vent needs to maintain 4" round at ceiling, pipe nail plate in closet is smashing pipe, make notch bigger laundry room side and add nail plates- left correction notice front window
|
Pressure Test | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- gauge wont zero out
|