Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberMEC18-04683
StatusFinaled
Name ALLEY HEATING & COOLING
Site Address 2010 S HUDSON AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
New
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/23/20195/24/20195/24/2019PPASS
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Oleg Chervak
- final ok signed occ card
Final4/1/20194/1/20194/1/2019PPART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Oleg Chervak
- temp final ok
Final3/29/20193/29/20193/29/2019PNR
DetailsJack Reynolds
Inspection requested via web by Oleg Chervak
- 4 units still need air balanced and all reports need to be onsite in each unit
Final3/28/20193/29/20193/29/2019ANR
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Oleg Chervak
Rough-in12/12/201812/12/201812/12/2018PPASS
DetailsJack Reynolds
3 FLOOR Phone #: ###-#### Inspection requested via web by Oleg Chervak
- R/I for 2nd floor and 3rd floor ok buidling D
Rough-in12/11/201812/11/201812/11/2018PNR
DetailsJack Reynolds
PAR 2 FLOOOR Phone #: ###-#### Inspection requested via web by Oleg Chervak
- talked with montey and he said they are not finished and it wouldn't pass yet
- not ready
Rough-in12/6/201812/7/201812/7/2018AFAIL
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Oleg Chervak
-2nd floor SE unit needs duct seal
-2nd floor NW unit duct work not finished and needs duct seal
-2nd floor NE needs duct seal in the hallway and mech room
Rough-in12/6/201812/6/201812/6/2018PPART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Oleg Chervak
- 1st floor only R/I ok- duct seal ok
- 2nd floor needs some duct seal finished and duct work that penetrated the ceiling needs to be moved
- 3rd floor needs duct work penetrating ceiling moved to wall
Rough-in11/26/201811/27/201811/27/2018ACANC
DetailsJack Reynolds
PARTIAL Phone #: ###-#### Inspection requested via web by Oleg Chervak
Rough-in10/19/201810/19/201810/19/2018PPART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Oleg Chervak- partial R/I for pre rock so that soffits can be framed and duct work can be ran- This partial is on dryer vents and and exhaust ducting- still need to see dryer installation instruction- its being said that the dryers being installed have the ability to run 120 ' for one model and 200 ' for another model i did see an email chain back and forth from GE and owners on this topic-
Rough-in10/9/201810/10/201810/10/2018ANR
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Oleg Chervak- not ready- need to see nail plates on dryer exhuast and a few linesets- also need to see specs on dryer for the first floor because lengths will be longer than 35'- R/I will be a partial so dry wall can be installed on ceiling for fire rating- equipment will set near final aswell