Final | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Final | 5/31/2019 | 6/3/2019 | 6/3/2019 | P | PART |
Brian Scoles
|
|
|
if questions call Mike C. @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- gas piping after shutoff valve to unit heater 6 needs extended down has conflict with fkue vent, flue vent needs grade to outside and gas line is pushing it up- need to seal weather tight exterior penetration at meter location- went over onsite with installer- will final this permit out when other Mech contractor inspection is completed- Rest is good
|
Pressure Test | 5/22/2019 | 5/22/2019 | 5/22/2019 | A | PART |
Brian Scoles
|
|
|
call mike with questions 208 ###-#### Inspection requested via web by Stacia Haumann- 60lb gas pass from meter to roof- will need to see 20lb test after regulators thru roof to unit heaters- will needs secure piping on roof to roof blocks and install condensate drains on RTUs by final
|
Pressure Test | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | FAIL |
Brian Scoles
|
|
|
if questions call Mike C. @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- 60lb gas test needs to have max 100lb gauge- would like temp shut off valve installed between gauge and gas piping for pressure test
|