Final | 4/10/2019 | 4/11/2019 | 4/11/2019 | A | PASS |
Jack Reynolds
|
|
|
duct blast witness @ 11am Phone #: ###-#### Inspection requested via web by Gary Reeves - duct blasts ok - final ok on both units 1316 & 1318
|
Pressure Test | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - 20lb gas pressure test ok on both north and south unit
|
Rough-in | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - R/I ok on both south and north unit
|
Rough-in | 12/10/2018 | 12/11/2018 | 12/11/2018 | P | FAIL |
Jack Reynolds
|
|
|
units 1 and 2 Phone #: ###-#### Inspection requested via web by Gary Reeves - exhaust fans need sealed both units - north unit has an exhaust fan upstairs that needs finished - combustion air for water heater in mech closet upstairs both units - will need to see a 5lb flue pressure test on both furnaces at final
|
Pressure Test | 12/10/2018 | 12/11/2018 | 12/11/2018 | P | FAIL |
Jack Reynolds
|
|
|
units 1 and 2 Phone #: ###-#### Inspection requested via web by Gary Reeves - south unit pressure test fail gauge was at zero - north unit pressure test 20lb ok
|