Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberMEC18-05903
StatusFinaled
Name VELOCITY HEATING & COOLING
Site Address 4015 N DELMONTE DR
Project Name 
Customer Number2220
ePlanReviewNo
Description
Alteration or Repair: Run gas line to existing unit heater with future t.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/2/20191/3/20191/3/2019PPASS
DetailsBrian Scoles
Contact Dave Dixon at the number above if you have any questions.
Phone #: ###-#### Inspection requested via web by David Dixon
Pressure Test12/28/201812/28/201812/28/2018PPASS
DetailsBrian Scoles
The inspector has already been given permission by owner to enter the garage to whiteness the test. Contact the contractor Greg Bouwer at ###-#### for any questions about gaining entrance. Phone #: ###-#### Inspection requested via web by David Dixon- 60lb gas pass- tagged gas line at meter bar- will need to see drip leg after shut off valve but before regulator and need to secure csst above unit heater flue vent with 6" clearance to csst by final- call in final when ready
Pressure Test12/11/201812/12/201812/12/2018AFAIL
DetailsBrian Scoles
Please contact the contractor Greg Bauer at ###-#### when your on your way so he can meet you there. Phone #: ###-#### Inspection requested via web by David Dixon- 2lb gas test needs 100 pound gauge max with 60lb test on line- need drip leg after shut off valve before regulator on unit heater-
Pressure Test12/10/201812/11/201812/11/2018PNH
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by David Dixon- no one home- can not enter residence with out homeowner or contractor present-