Final | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Brian Scoles
|
|
|
###-####- final ok
|
Final | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- per phone call to homeowner i rescheduled for tomorrow am inspection- wasnt home today
|
Final | 2/14/2019 | 2/14/2019 | 2/14/2019 | P | FAIL |
Brian Scoles
|
|
|
If you could please give Stephanie (homeowner) a call when you head her direction, she said that would be great. Phone #: ###-#### Inspection requested via web by Kim Evans- needs right size breaker in panel or fuseable disconnect installed at a/c location- primary drain off coil needs to be ran in 3/4" all the way to outside-recall in when completed
|
Final | 1/31/2019 | 2/6/2019 | 2/6/2019 | A | CANC |
Brian Scoles
|
|
|
If you could call the homeowner when you''re on your way that would be greatly appreciated. Thank you Phone #: ###-#### Inspection requested via web by Kim Evans- per phone call with homeowner ionstall has not been done yet- installing next week- reschedule when install is complete
|