Final | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | PASS |
Brian Scoles
|
|
|
garage code #3162 Phone #: ###-#### Inspection requested via web by Debbie Marino- final ok
|
Final | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | FAIL |
Brian Scoles
|
|
|
garage code #3162 Phone #: ###-#### Inspection requested via web by Debbie Marino- insulation needs completed in garage at 90 degree bare metal showing- gas line to fireplace not connected
|
Conference | 5/29/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Brian Scoles
|
|
|
duct blast test witness- duct blast test pass
|
Conference | 5/23/2019 | 5/28/2019 | 5/28/2019 | A | FAIL |
Brian Scoles
|
|
|
8:30 am Duct Blast Phone #: ###-#### Inspection requested via web by Debbie Marino- duct blast failed- has issues
|
Conference | 5/23/2019 | 5/24/2019 | 5/23/2019 | P | CANC |
Brian Scoles
|
|
|
12:45pm Duct Blast Phone #: ###-#### Inspection requested via web by Debbie Marino- scheduled for 5-28-19 in am
|
Rough-in | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- R/I ok- fireplace R/I ok
|
Rough-in | 2/26/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- fireplace R/I ok
|
Pressure Test | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- 20lb gas pass- tagged meter location
|