Final | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Brian Scoles
|
|
|
I well send you pictures. Phone #: ###-#### Inspection requested via web by Eric Sonner- final ok
|
Final | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | CANC |
Brian Scoles
|
|
|
Need to call 20 minutes before arrival to make sure someone''s there to let you in Phone #: ###-#### Inspection requested via web by Eric Sonner- rescheduled as R/I inspection
|
Rough-in | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | FAIL |
Brian Scoles
|
|
|
Need to call 20 minutes before arrival to make sure someone''s there to let you in Phone #: ###-#### Inspection requested via web by Eric Sonner- need light switch accessable from attic entrance- condensate drains need to 3/4 pvc with 1/4" slope to drain- need walkable platform to mini split in attic- recall in when completed
|