Final | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Brian Scoles
|
|
|
HVAC Contact: Dan ###-#### Builder Contact: Andy ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- final all units ok- card signed
|
Final | 7/25/2019 | 7/26/2019 | 7/26/2019 | P | PART |
Brian Scoles
|
|
|
For the 3rd 6 units. Please call Dan on your way ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- 101,102, 201, 202, 301, 302- 103, 104, 203, 204, 303, 304- 105, 106, 205, 206, 305, 306- need air balance report all units- need all exterior registers installed- caulk all dryer duct to termination box
|
Final | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | NR |
Brian Scoles
|
|
|
For the 2nd 6 units. Please call Dan on your way ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- per phone call with Dan units have not been air balanced- will recall in when ready
|
Final | 7/16/2019 | 7/18/2019 | 7/18/2019 | A | PART |
Brian Scoles
|
|
|
First 6 Units are ready for final. Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- 107, 108,207,208,307 and 308 ok- missing grills outside on order- will look at on final final
|
Final | 7/15/2019 | 7/17/2019 | 7/16/2019 | A | CANC |
Brian Scoles
|
|
|
First 6 Units Ready. Daniel ###-####. Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
Rough-in | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Brian Scoles
|
|
|
last 6 units on 24 plex // Daniel Phone #: ###-####- R/I units 101, 1032, 201, 202, 301 and 302 ok- all 24 units ok to cover
|
Rough-in | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | PART |
Brian Scoles
|
|
|
Dan Phone #: ###-####- R/I ok units 103, 104, 203, 204, 303 and 304 ok to cover
|
Rough-in | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PART |
Brian Scoles
|
|
|
units 105, 106, 205, 206, 305 and 306 R/I ok- ok to cover
|
Rough-in | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PART |
Brian Scoles
|
|
|
Daniel ###-#### - First 6 of 24 Plex Phone #: ###-#### Inspection requested via web by Arielle Hendricks- R/I for units 107, 108, 207, 208,307 and 308 only ok to cover
|
Conference | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | DONE |
Chad Schwendiman
|
|
|
10:00 am - Met to discuss fresh air ventilation
|
Conference | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | DONE |
Brian Scoles
|
|
|
10:00 am- discussed removing frsh air to furnace and using energy star fans with timers- 8 plexes only- will cap off 6" fresh air in furnace closet and sheetrock or pan off holes 12 locations- 24 plex ok as installed
|
Rough-in | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Arielle Hendricks- need 2nd floor framing completed and registers installed- missing fire caulk couple places 2nd floor exhaust at wall penetration- 3rd floor register cans need sealed west unit- 1st floor east unit needs duct in crawl supported- talked onsite with Dan about these issues
|
Rough-in | 4/4/2019 | 4/5/2019 | 4/5/2019 | P | FAIL |
Brian Scoles
|
|
|
Please inspect in the late PM. Daniel ###-####. First six units ready for Rough-In Phone #: ###-#### Inspection requested via web by Arielle Hendricks- need approved manual J onsite to do inspection approved by city
|
Rough-in | 4/4/2019 | 4/5/2019 | 4/4/2019 | A | CANC |
Brian Scoles
|
|
|
The 1st six units are ready for Rough-In Inspection. Daniel ###-#### Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
Conference | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | DONE |
Brian Scoles
|
|
|
Joel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- discussed exhaust fan and exhaust termination on 3 story apartment complex- gave option to contractor and general contractor- exhaust air shall not discharge on public walkway-
|