Final | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brian Scoles
|
|
|
final - call david Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- card signed
|
Final | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | CANC |
Brian Scoles
|
|
|
Call David Lopez ###-#### prior to inspection for assistance Phone #: ###-#### Inspection requested via web by Brandon Sorensen- should have been rough in inspection
|
Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Brian Scoles
|
|
|
Call David Lopez ###-#### prior to inspection for assistance Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on all duct ok- ok to insulate remaining duct- need another inspection for final- leave out ceiling tiles certain areas to look at insulation- went over onsite with GC and installer- exhaust on one RTU needs to be 3 feet higher than economizer within 10 feet-
|
Final | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | FAIL |
Chad Schwendiman
|
|
|
Final - Call David Lopez Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Need to support flex duct in doctors work room, Need to seal duct work that isn't sealed, only a partial rough inspection was given for duct seal. need to cordinate with Brain to expose duct work not inspected to show duct seal, Need to find away to show Brian duct work above the hard lids that were not called in for inspection prior to covering.
|
Rough-in | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PART |
Brian Scoles
|
|
|
sealer inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on misc ducts on RTU 1 2 3 4 and 5- ok to insulate these ducts only- will need to look at all seal when all ducts are in-
|