Final | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Brian Scoles
|
|
|
garage code 1234 Phone #: ###-#### Inspection requested via web by Terek Worley- final ok
|
Final | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | FAIL |
Brian Scoles
|
|
|
garage code 1234 Phone #: ###-#### Inspection requested via web by Terek Worley- needs duct blast test completed by 3rd part or if integrity does it will need to be witnessed- need 3 screws in flue to china cap attached to it
|
Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Terek Worley- contractor showed up went over corrections- R/I ok- tagged gas line
|
Rough-in | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | FAIL |
Brian Scoles
|
|
|
Approved Man J in bucket in kitchen with approved set of plans Phone #: ###-#### Inspection requested via web by Terek Worley- need ladder provided by contractor to access furnace/coil in attic- dryer duct in ceiling smashed needs to maintain 4" round ran in 2x4 construction under plant shelf needs firred up to 2x6 construction in ceiling and duct replaced- 3/4" primary drain needs rerouted in ceiling of laundry room to relieve undo stress on pvc- left correction notice front entry window
|
Pressure Test | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Brian Scoles
|
|
|
Approved Man J in bucket in kitchen with approved set of plans Phone #: ###-#### Inspection requested via web by Terek Worley- 20lb gas pass
|