Final | 7/16/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Final | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | CANC |
Ben Livingston
|
|
|
CORRECTIONS MADE PLEASE RE-INSPECT. GC 7530 Phone #: ###-#### >> Inspection requested via web by Oleg Chervak Inspection cancelled from web by: Oleg Chervak
|
Final | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- 1- need duct blast test completed and stickered 2- resubmit man j for approval of condenser brand used and have new approved man j onsite 3- b vent for 2 water heaters is undersized for 80000 btu need to reconfigure and install new 4 primay drain off coil to drain has backgrade
|
Final | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | NR |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- water heaters need vented and gas piping hooked up- need to seal linset and gas line penetrations- b vent needs 1" clearance at ceiling in garage- need approved man j onsite
|
Rough-in | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace and HVAC R/I ok
|
Rough-in | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | FAIL |
Chad Schwendiman
|
|
|
should be ready for inspection. Phone #: ###-#### Inspection requested via web by Oleg Chervak - Need 8" fresh air to return plenum, 6" is installed. Need to see framing repaired above fireplace to verify clearances
|
Pressure Test | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass- tagged gas line at meter location
|
Rough-in | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- still installing
|