Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Dave Sorensen
|
Rough-in | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Dave Sorensen- R/I ok- will need air balance on new supply ducting at final- condenser needs rotated 90 degrees from regulator on gas line to maintain 3 feet clearance and weather tight whip needs installed from disconnect to condenser by final
|
Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | CANC |
Chad Schwendiman
|
|
|
please call dave prior to arrival Phone #: ###-#### Inspection requested via web by Dave Sorensen
|
Rough-in | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | FAIL |
Brian Scoles
|
|
|
flue pressure test and rough in. call Tracy 30 min prior to arrival @ 208 -###-#### for access to job site Phone #: ###-#### Inspection requested via web by Dave Sorensen- need to submit manual J to city for approval and have approved copy onsite for inspection
|
Pressure Test | 6/6/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Brian Scoles
|
|
|
flue pressure test and rough in. call Tracy 30 min prior to arrival @ 208 -###-#### for access to job site Phone #: ###-#### Inspection requested via web by Dave Sorensen- 5lb flue test pass
|