Final | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Brian Scoles
|
|
|
Pat Nichols site contact Phone #: ###-#### Inspection requested via web by RM Mechanical- final ok- card signed
|
Final | 7/10/2019 | 7/11/2019 | 7/11/2019 | P | PART |
Brian Scoles
|
|
|
kitchen hood // James Phone #: ###-####- need all appliance set into place under class 1 hood- need air balance report onsite for all hoods- left side of north hood needs 18" ss panels installed in ceiling can not have ceiling tile within 18" went over with general onsite- need to uv protect arma flex on roof and seal water tight on line set penetration- call in when ready- dishwasher hood ok-
|