Rough-in | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Ben Livingston
|
|
|
3rd floor cover Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 3rd floor area A duct seal
|
Rough-in | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Ben Livingston
|
|
|
shaft inspection Phone #: ###-#### Inspection requested via web by Amanda Farnsworth -2nd floor to 4th floor okay 2shafts
|
Rough-in | 5/5/2020 | 5/5/2020 | 5/6/2020 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - chace 2nd floor procedure room north
|
Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - ac 2 and 3 1st to 4th floor shafts supply and return
|
Final | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | NR |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Mike said no inspection needed
|
Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Ben Livingston
|
|
|
1st floor area A Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 1st and 2nd floor area A low pressure duct seal
|
Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 3rd and 4th floor linesets fire caulked in wall - 2 nd floor area D supply and return trunk lines duct seal
|
Rough-in | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Ben Livingston
|
|
|
2nd floor shaft cover Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 2nd floor 2 shafts insulation okay - 2nd floor 2 main duct seal
|
Rough-in | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Ben Livingston
|
|
|
2nd floor area c shafts Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 3 shafts 2nd floor area C - low pressure duct seal 2nd floor area C
|
Rough-in | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Ben Livingston
|
|
|
Boiler Flue Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 2- 26" boiler flues from 1st floor to roof -
|
Rough-in | 2/11/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Ben Livingston
|
|
|
rough in inspection on level 2 area A Phone #: ###-#### Inspection requested via web by Amanda Farnsworth 2nd floor area A, low pressure duct seal okay, highlighted in blue -
|
Rough-in | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 2nd floor all in wall returns insulated -
|
Rough-in | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 2nd floor low pressure vav duct seal labelled in pink okay - - exhaust fan 12 duct seal -
|
Rough-in | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PART |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 2nd floor returns in walls in O.R. -
|
Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PART |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 2nd floor part main trunk lines in corridors duct seal -
|
Rough-in | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 3rd floor AHU 8 S/A 20' duct seal -
|
Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 3rd floor AHU 6 S/A shaft, AHU 8 return shaft duct insulation okay -
|
Rough-in | 9/4/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - 3rd floor AHU 6 S/A shaft, AHU 8 return shaft duct seal okay-
|
Rough-in | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth -- AHU 5 to roof louver okay-
|
Rough-in | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Ben Livingston
|
|
|
H9778 - Mike Pena request for an inspection. Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - AHU-5 3 transitions and 1 elbow-
|
Rough-in | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth -- elbow and 1 section of duct to mau 5, duct wrap and seal and support--
|
Rough-in | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth -AHU-5 make up air 2nd to 3rd floor duct seal and bracing--
|