Final | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Eric Strole
|
|
|
inspector can go any time during day, all corrections are complete. Please call me if you have any questions. Thank You, Tom Phone #: ###-#### Inspection requested via web by Tom Bratcher
|
Final | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | NR |
Eric Strole
|
|
|
Inspector can go to site any time throughout day, it is ready. Thank You Phone #: ###-#### Inspection requested via web by Tom Bratcher-Have not received balance report as discussed at last inspection. When balance report is sent to Chad call back in for final.
|
Final | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Chad Schwendiman
|
|
|
Tom Bratcher will be on-site to go over inspection with mechanical inspector. Thank You Phone #: ###-#### Inspection requested via web by Tom Bratcher - Temporary occupancy okay. Need to patch aramflex in east side mechanical room, Need email from Air balancer stating economizer is fuctioning per engineers design.
|
Rough-in | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PART |
Eric Strole
|
|
|
Please contact Tom Melton at jobsite and he will show you what we need for inspection. We are looking to insulate ductwork in the mechanical rooms. Thank You Phone #: ###-#### Inspection requested via web by Tom Bratcher-Ok to insulate ducts in 2nd mechanical room.
|
Conference | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | DONE |
Chad Schwendiman
|
|
|
Please ask for tom on the jobsite. Phone #: ###-#### Inspection requested via web by Tom Bratcher - Went by to go over the economizer set up.
|
Rough-in | 11/7/2019 | 11/7/2019 | 11/7/2019 | A | PART |
Eric Strole
|
|
|
Please ask for tom on the jobsite. This inspection will be for approval to insulate ductwork in the mechanical room Phone #: ###-#### Inspection requested via web by Tom Bratcher-OK to insulate west side mechanical room.
|
Rough-in | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Eric Strole
|
|
|
Please call Tom when on the way. This inspection is for approval to install ceiling tiles in the grid Phone #: ###-#### Inspection requested via web by Tom Bratcher-Above grid pass.
|
Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Ben Livingston
|
|
|
Inspector please call Tom when on the way. You can come in morning or afternoon, whichever you prefer. Thank you Phone #: ###-#### Inspection requested via web by Tom Bratcher - duct seal ok to insulate -
|
Rough-in | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PART |
Jack Reynolds
|
|
|
This inspection is rough for cover. Tom will be on site to meet with you. Thank you Phone #: ###-#### Inspection requested via web by Tom Bratcher - R/I bathrooms hard lid cover only ok
|