Final | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | PASS |
Brian Scoles
|
|
|
PROJECT MANAGER DAN ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- final ok
|
Mec-Aging Inspection | 7/8/2020 | 7/8/2020 | 7/8/2020 | | FAIL |
Brian Scoles
|
|
|
contractor needs to schedule final inspection and make sure high temp silicone was used- only did pressure test previous inspection- permit will expire next aging if no activity
|
Pressure Test | 12/3/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Brian Scoles
|
|
|
INSTALLER TRAVIS ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- 20lb gas pass- tagged meter location- exhaust flue needs sealed with approved high temp silicone by final on 3 unit heaters
|
Final | 12/3/2019 | 12/5/2019 | 12/5/2019 | P | CANC |
Brian Scoles
|
|
|
INSTALLER TRAVIS ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|
Final | 12/2/2019 | 12/6/2019 | 12/3/2019 | P | CANC |
Brian Scoles
|
|
|
INSTALLER JOHN ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|
Pressure Test | 12/2/2019 | 12/6/2019 | 12/3/2019 | P | CANC |
Brian Scoles
|
|
|
INSTALLER JOHN ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|