Final | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Ben Livingston
|
|
|
Please call Don at the 361# and Ted at ###-#### at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Final | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | CANC |
Ben Livingston
|
|
|
Chilled water final, please call Don for any questions, thank you! Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum Inspection cancelled from web by: Rhonda Marcum
|
Rough-in | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Ben Livingston
|
|
|
Mech. Rough In Inspection for cooling water in the Emergency Clean Room. Please call 30 mins prior to arrival. Don: ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - hydronics at working pressure
|
Rough-in | 6/16/2020 | 6/17/2020 | 6/17/2020 | P | PASS |
Ben Livingston
|
|
|
Please call Ted at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - fire damper and duct seal lower basement
|
Pressure Test | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Ben Livingston
|
|
|
Mechanical Piping, please call/text Don at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - hydronic piping to vavs working pressure
|
Rough-in | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Ben Livingston
|
|
|
Cover- Please call/text Ted at least 30 min prior to inspection, he is ready to do video or pictures for inspection if needed Phone #: ###-#### Inspection requested via web by Rhonda Marcum - firesmoke damper angles, duct seal
|
Rough-in | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Ben Livingston
|
|
|
Located at 190 E Bannock, please call/text Ted at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - passed with virtual inspection
|
Rough-in | 4/6/2020 | 4/6/2020 | 4/7/2020 | P | PASS |
Ben Livingston
|
|
|
Sealant inspection, 190 E Bannock building, Please call/text Ted at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
- duct seal on 3 vavs in sub basement - inspection done with google duo
|
Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Ben Livingston
|
|
|
Mechanical Piping Building on 190 E Bannock, Please call Don at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - condensate piping to vav under working pressure
|
Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Ben Livingston
|
|
|
Partial Mech. Inspection at 190 E Bannock. Please call 30 minutes prior to arrival. Ott: ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - priorites 1-5 bypass,and pit valves installed ok to ins.
|