Rough-in | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | PASS |
Ben Livingston
|
|
|
Site Contact is Ed Tannons ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - area A and sub bacement duct seal, FSD clearances
|
Rough-in | 7/7/2020 | 7/9/2020 | 7/9/2020 | A | PASS |
Ben Livingston
|
|
|
Please call at the number provided prior to arrival. Phone #: ###-#### Inspection requested via web by RM Mechanical - hydronic complete loop area G basement to 6th floor 10lb x2
|
Rough-in | 7/1/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Ben Livingston
|
|
|
contact Gary at the number provided prior to arrival. Phone #: ###-#### Inspection requested via web by RM Mechanical - area G heating and cooling loop 100lb test x2
|
Rough-in | 6/19/2020 | 6/22/2020 | 6/22/2020 | A | PASS |
Ben Livingston
|
|
|
Please contact Gary at the number provided or Wes Hall at ###-####. Phone #: ###-#### Inspection requested via web by RM Mechanical - 100lb x2 heating loop basement to 5th floor
|
Rough-in | 6/17/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Ben Livingston
|
|
|
Please contact Wes Hall at the number provided prior to arrival. Phone #: ###-#### Inspection requested via web by RM Mechanical - 100lb x2 drain downs in sub basement
|
Rough-in | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | PASS |
Ben Livingston
|
|
|
Please call Gary at the number provided prior to arrival. Phone #: ###-#### Inspection requested via web by RM Mechanical - snow melt hydronic 100lb x2 in sub basement part.
|
Rough-in | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | PASS |
Ben Livingston
|
|
|
Please call Gary at the number provided. 11:30 am is the best time to arrive for an empty jobsite. Phone #: ###-#### Inspection requested via web by RM Mechanical - 100lb x2 hydronic heating basement to 6th floor
|
Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | P | PASS |
Ben Livingston
|
|
|
Please contact Eric Frank at the number provided. 1 pm time preferred. Phone #: ###-#### Inspection requested via web by RM Mechanical - sub basement hot and chilled hydronic 100lb - please provide detail on locations of 3 way valves
|
Rough-in | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | FAIL |
Ben Livingston
|
|
|
Hydronic piping rough in. Please contact Eric Frank at the number provided. Phone #: ###-#### Inspection requested via web by RM Mechanical - not adhearing to covid 19 protocalls
|
Rough-in | 4/3/2020 | 4/6/2020 | 4/6/2020 | A | CANC |
Ben Livingston
|
|
|
Sit Contact - Ed Tannons. If no answer to phone call please send a text Phone #: ###-#### Inspection requested via web by RM Mechanical - fire smoke damper conf.
|