MIS-Aging Inspection | 7/7/2020 | 7/7/2020 | 7/7/2020 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 7/7/2020 | 7/7/2020 | 7/7/2020 | P | PASS |
Mike Jordan
|
|
|
A building permit has been issued and finaled.
|
BLD-Conference | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | CANC |
Mike Jordan
|
|
|
mike..check on this address..no work was being done on 7/26/2019..
|
BLD-Conference | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | DONE |
Tell Riley
|
|
|
work is still going on. Small home in front has construction still going on//no one onsite working//i do not see any sign of work on eaither home//
|
BLD-Conference | 7/17/2019 | 7/23/2019 | 7/23/2019 | A | DONE |
Mike Jordan
|
|
|
Follow up... Per contractor (Ryan Curtis ###-####) Theyare in the process of applying for an administrative zoning alternate.
|
BLD-Conference | 7/16/2019 | 7/16/2019 | 7/17/2019 | A | CANC |
Mike Jordan
|
|
|
Foloow up on detached structure being constructed with no permits.
|
BLD-Conference | 7/16/2019 | 7/16/2019 | 7/16/2019 | A | FAIL |
Mike Jordan
|
|
|
Noted that a detached accessory structure (2 steel shipping containers with pre engineered trusses) being constructed with no building premits. A corection notice was issued to submit plans and enginering for review and obtain building permit and to stop work until a building permit has been issued.
|